Installation must be written into the order.
The accepted scope should identify unloading, rigging, positioning, anchoring, leveling, assembly, utilities, fluid fill, network connection, software, tooling, guarding integration, startup, test material, acceptance checks, documentation, training, travel, and exclusions. A sales discussion or generic page does not add installation work.